As compared to wall type breakwater, mound type breakwater
A. Requires skilled labor
B. Requires low maintenance cost
C. Requires less material
D. Results in less damage due to gradual failure
Answer: Option D
Related Questions on Docks and Harbor Engineering
A. The length of design vessel
B. The length of design vessel + 10% clearance between adjacent vessels
C. The length of design vessel + 20% clearance between adjacent vessels
D. Twice the length of design vessel
A. Beam
B. Depth
C. Free-board
D. Draft
A. (i) and (ii) are correct
B. (ii) and (iii) are correct
C. (i) and (iii) are correct
D. (i), (ii) and (iii) are correct
A. (i) and (ii) are correct
B. (ii) and (iii) are correct
C. (i) and (iii) are correct
D. Only (iii) is correct
Join The Discussion