Broken working referred as
A. Pillar cutting
B. Solid wire blast
C. Caving
D. First working
Answer: Option A
A. Pillar cutting
B. Solid wire blast
C. Caving
D. First working
Answer: Option A
The required water for 1 ton of sand in hydraulic sand stowing is . . . . . . . .
A. 800 l
B. 600 l
C. 1100 l
D. 1200 l
Join The Discussion