48.
Normal tension is that pull which

49.
After fixing the plane table to the tripod, the main operations which are needed at each plane table station are
(i) Levelling
(ii) Orientation
(iii) Centering
The correct sequence of these operations is

50.
For accurate work, the steel band should always be used in preference to chain because the steel band

Read More Section(Surveying)

Each Section contains maximum 70 questions. To get more questions visit other sections.