Commercial power generation for fusion reactor is not yet possible, because
A. it is difficult to control fusion reaction
B. the fuel required (e.g., deuterium & tritium) is scarce
C. it is difficult to initiate fusion reaction
D. quantity of fuel required for initiating the fusion reaction is prohibitively high
Answer: Option A

Join The Discussion