Consider the following about Guru Nanak Dev Thermal Plant.
1. At Bathinda
2. Gets coal from Jharkhand
3. Functioning from 1982
4. Generate 440 MW
Which of the following is true?
A. 1, 2 and 3
B. 2, 3 and 4
C. 1, 3 and 4
D. All of these
Answer: Option D