Continuous miner and shuttle car combination is NOT applicable in mining with
A. rib pillar extraction technique
B. wangawilli system
C. room and pillar method
D. longwall method
Answer: Option B
Related Questions on Introduction to Mining Engineering
A. Normal distribution
B. Skewed distribution
C. Lognormal distribution
D. Poisson distribution
A. 3 level heading district
B. 4 level heading district
C. 5 level heading district
D. 6 level heading district
It is very difficult to control shaley roof if coal is not left with the shale why?
A. It is weak in nature
B. It has weathering effect
C. It has great affinity to absorb moisture and get departed from immediate roof
D. It reacts with coaly surface