Controlling the course of a bore hole so as to follow predetermined path . . . . . . . . is
A. Directional drilling
B. Controlled drilling
C. Deviation of bore holes
D. Wire line drilling
Answer: Option A
A. Directional drilling
B. Controlled drilling
C. Deviation of bore holes
D. Wire line drilling
Answer: Option A
The required water for 1 ton of sand in hydraulic sand stowing is . . . . . . . .
A. 800 l
B. 600 l
C. 1100 l
D. 1200 l
Join The Discussion