Controlling the course of bore hole to follow predetermined path and complete the hole at desired surface location called
A. Bore hole deflection
B. Directional drilling
C. Deviation
D. All these
Answer: Option A
A. Bore hole deflection
B. Directional drilling
C. Deviation
D. All these
Answer: Option A
The required water for 1 ton of sand in hydraulic sand stowing is . . . . . . . .
A. 800 l
B. 600 l
C. 1100 l
D. 1200 l
Join The Discussion