During the system study, the executive vice-president and the other managers exercise their responsibility of
A. planning
B. controlling
C. directing
D. organizing
E. None of the above
Answer: Option B
Solution (By Examveda Team)
The correct answer is (B) controlling.Let's break down why:
System Study Overview: A system study involves a thorough examination of an existing system (or a proposed new one) to understand its strengths, weaknesses, and areas for improvement.
Now let's look at the options in the context of a system study and management's role:
(A) planning: While planning is important, during the system *study* itself, the main activity isn't creating new plans. Planning happens more before and after the study.
(B) controlling: Controlling, in this context, means ensuring that the system study is conducted properly, stays on track, meets its objectives, and aligns with the organization's goals. Managers oversee the process, monitor progress, and make adjustments if needed. They are making sure the study is yielding useful information.
(C) directing: Directing involves telling people what to do. While managers provide some direction, during a study, their primary role is to *oversee* and *monitor* (control) the process, not micromanage every step.
(D) organizing: Organizing, like planning, is something that happens *before* the system study really gets going. It involves setting up the team, resources, and structure for the study.
(E) None of the above: This is incorrect because 'controlling' accurately describes the management role during the system study.
Therefore, executive vice-presidents and other managers are exercising their responsibility of *controlling* the system study process to ensure it's effective and beneficial for the organization.
Join The Discussion
Comments (2)
Related Questions on System Analysis and Design
A. study of an existing system
B. documenting the existing system.
C. identifying current deficiencies and establishing new goals
D. All of the above
E. None of the above
The primary tool used in structured design is a:
A. structure chart
B. data-flow diagram
C. program flowchart
D. module
E. None of the above
In a _____ one module of the new information system is activates at a time.
A. System Development Life Cycle
B. CASE tool
C. Phased Conversion
D. Success factors
E. None of the above.
A. BASIC is used
B. COBOL is used
C. 4GLs are used
D. system is documented
E. None of the above

Correct answer should be directing
Why not organizing?