For an open pit mining the value of metal is Rs. 210 per kg, and recoverable grade is 1.2%. Production cost per tonne of ore inclusive of mining and processing but excluding stripping is Rs. 2000. If the break even stripping ratio is 3.49 m3/te, then the stripping cost is
A. Rs. 149 per m3
B. Rs.72 per m3
C. Rs.60 per m3
D. Rs.49 per m3
Answer: Option A