For constructing a terrazzo floor, Pick up the incorrect statement from the following:
A. A base course is prepared as in cement concrete flooring
B. A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling
C. Glass strips are driven into the layer according to the pattern required
D. After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material
Answer: Option C
Solution (By Examveda Team)
In constructing a terrazzo floor, the statement that glass strips are driven into the layer according to the pattern required is incorrect.Instead, the glass chips or aggregates are mixed with the terrazzo binder before being spread over the surface, not driven into it.
The correct process involves preparing a base course, laying a thick layer of cement concrete, and then applying the terrazzo mixture on top.
After laying the terrazzo, it is ground to a smooth finish, and oxalic acid is used to enhance the surface's shine.
Join The Discussion
Comments (1)
The window which is provided in flat roof of a room, is known
A. Dormer window
B. Lantern window
C. Louvered window
D. Sky window
Weep holes are provided in retaining and breast walls
A. To drain off the water from the filling
B. To ventilate the stone masonry
C. To add architectural beauty
D. To increase compaction of the earth retained
A. Haunch
B. Spandril
C. Voussoirs
D. Skewbacks

correct answer is C