If direct material cost is $85000 and direct manufacturing labour is $25000, then prime cost would be
A. $13,500
B. $55,600
C. $60,000
D. $110,000
Answer: Option D
Solution (By Examveda Team)
Prime cost = Direct material cost + Manufacturing labour= $85000 + $25000 = $110,000