If the R.L’s of canal bed level and high flood level of drainage are 212.0 m and 210.0 m respectively, then cross drainage work will be
A. aqueduct
B. superpassage
C. syphon
D. syphon aqueduct
Answer: Option A
Solution (By Examveda Team)
An aqueduct is a type of cross drainage work where the canal passes over the drainage.In this case, the R.L. (Reduced Level) of the canal bed is higher at 212.0 m compared to the high flood level of the drainage at 210.0 m.
This difference in levels makes an aqueduct the appropriate structure, allowing the canal to safely cross above the drainage.
It's aqueduct
Gyz Option C is Correct..
Because the R.L is measured on Staff with reference to a benchmark.
so low reading on staff means high elevation so ultimately 210 HFL of dranige will be higher than 212 of canal bed.
so Syphon need to be provided
Obslutly ans will be aqueduct so correct option should be A
Aqueduct
Its aqueduct
it is aqueduct
Wrong answer
A is correct
Mr. Santosh Kr. Garg" Page nos. 486 & 487, Example 14.1....answer is . aqueduct
Hence, only option (A) Aqueduct will be the most appropriate answer.
As per "Irrigation and Hydraulic Structures by Mr. Santosh Kr. Garg" Page nos. 736 & 737, Example 14.1, it has been clearly mentioned "Canal Bed Level (RL = 212.0 m) is much higher than the High Flood Level of Natural Drainage (RL = 210.0 m); Hence, Aqueduct should be constructed."
It is aqueduct
Aqueduct or syphon aqueduct,, right answer
I think aqueduct is correct answer