In a Decision tree
A. the root is drawn on the left and is the starting point on the decision sequence
B. the branch, to be followed, depends on the conditions and decisions, to be made
C. the nodes represent the conditions, with the right wise of tree listing the actions to be taken
D. All of the above
E. None of the above
Answer: Option D
A. study of an existing system
B. documenting the existing system.
C. identifying current deficiencies and establishing new goals
D. All of the above
E. None of the above
The primary tool used in structured design is a:
A. structure chart
B. data-flow diagram
C. program flowchart
D. module
E. None of the above
In a _____ one module of the new information system is activates at a time.
A. System Development Life Cycle
B. CASE tool
C. Phased Conversion
D. Success factors
E. None of the above.
A. BASIC is used
B. COBOL is used
C. 4GLs are used
D. system is documented
E. None of the above