In cut and fill stope the main purpose of back filling is to . . . . . . . .
A. Reduce are dilution
B. Prevent high stress concentrations
C. Prevent displacement due to dilation of fractured wall rock
D. Improve ore re-handling
Answer: Option C
A. Reduce are dilution
B. Prevent high stress concentrations
C. Prevent displacement due to dilation of fractured wall rock
D. Improve ore re-handling
Answer: Option C
A. Chip sampling
B. Channel
C. Bulk
D. Radio metre
The ore loaded in shrinkage stoping by . . . . . . . .
A. Over head mucker
B. Pneumatic Auto Loader
C. LHD
D. None
If the ore body is thicker, the level interval will be . . . . . . . .
A. More
B. Lessor
C. Stronger
D. Weaker