In the method of tube boring of soil investigation, the following is essential:
A. A tube of about 2 meters length and 20 cm diameter with a cutting edge
B. A flap valve at the bottom of tube is provided to extract the soil sample
C. The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand
D. All the above
Answer: Option D
Related Questions on Building Construction
The window which is provided in flat roof of a room, is known
A. Dormer window
B. Lantern window
C. Louvered window
D. Sky window
Weep holes are provided in retaining and breast walls
A. To drain off the water from the filling
B. To ventilate the stone masonry
C. To add architectural beauty
D. To increase compaction of the earth retained
A. Haunch
B. Spandril
C. Voussoirs
D. Skewbacks