In which project did engineers face challenges due to high-pressure artesian groundwater during excavation?
A. Gotthard Base Tunnel
B. Bangkok Subway
C. Boston Big Dig
D. Delhi Metro Phase-3
Answer: Option C
Solution (By Examveda Team)
Boston Big Dig encountered artesian groundwater conditions that complicated deep excavations. Engineers used advanced dewatering and waterproofing to mitigate this.Which geotechnical failure occurred in the 1963 Vajont Dam disaster in Italy?
A. Overtopping of dam
B. Foundation failure
C. Landslide into reservoir
D. Earthquake-induced cracking
What was the main geological issue in the Panama Canal expansion project?
A. Lava flow
B. Marine sediment instability
C. Hard rock tunneling
D. Seismic liquefaction
In the case of the Leaning Tower of Pisa, what caused the leaning?
A. Uneven settlement due to clayey soil
B. Earthquake damage
C. Poor construction material
D. Tectonic movement
Which engineering technique stabilized the Hong Kong slopes after landslide disasters?
A. Tunneling
B. Shotcreting and soil nailing
C. Earth reinforcement
D. Floating raft foundation
Join The Discussion