ExamVeda
Login
Home
21
In a cut-and-fill stope, the main purpose of back filling is to
Discuss
Answer & Solution
Answer: Option C
No explanation is given for this question. Let's Discuss on Board
22
Maximum Lump size that can be conveyed by belt conveyer is
Discuss
Answer & Solution
Answer: Option A
No explanation is given for this question. Let's Discuss on Board
23
How much time a dragline may take to complete a cycle for a single pass?
Discuss
Answer & Solution
Answer: Option C
No explanation is given for this question. Let's Discuss on Board
24
A narrow vertical or inclined excavation made in the ore block along the width and the height of a stope to continue stoping is termed as
Discuss
Answer & Solution
Answer: Option B
No explanation is given for this question. Let's Discuss on Board
25
Two coal seams are called contiguous if they are A m (maximum) apart from each other. A is given by
Discuss
Answer & Solution
Answer: Option C
No explanation is given for this question. Let's Discuss on Board
26
The sale value of chromite ore from an open pit mine is Rs. 6500 per tonne. Cost of mining, excluding stripping cost, is Rs. 2450 per tonne. If the cost of stripping is Rs. 1150 per m3, the breakeven stripping ratio in m3/tonne is
Discuss
Answer & Solution
Answer: Option B
No explanation is given for this question. Let's Discuss on Board
27
From a hard rock open pit mine, the following data available
Burden : 3 m
Spacing : 4 m
Bench height : 12 m
Sub-drilling : 1 m
Collar stemming : 4 m
Diameter of hole : 150 mm
Density of rock : 2500 kg/m3
Density of explosive : 800 kg/m3
The powder factor in kg/t is
Discuss
Answer & Solution
Answer: Option C
No explanation is given for this question. Let's Discuss on Board
28
As per the Indian Electricity Rules 1956. the maximum permissible length of a flexible cable used with an electric rope shovel in m is
Discuss
Answer & Solution
Answer: Option C
No explanation is given for this question. Let's Discuss on Board
29
The slope angle for hard and compact ground should not be more than
Discuss
Answer & Solution
Answer: Option D
No explanation is given for this question. Let's Discuss on Board
30
The opening cut in open cast mining is known as
Discuss
Answer & Solution
Answer: Option B
No explanation is given for this question. Let's Discuss on Board