11
As per which circular immediate supports are required for slips, weaknesses in immediate roof?
Discuss
Answer & Solution
Answer: Option B
No explanation is given for this question. Let's Discuss on Board
12
What is the depth to be achieved for an excavation to be called a coal mine?
Discuss
Answer & Solution
Answer: Option A
No explanation is given for this question. Let's Discuss on Board
13
What is the periodicity of joint survey by user and manufacturer of cage suspension gear stipulated in DGMS Circular 1/2015?
Discuss
Answer & Solution
Answer: Option C
No explanation is given for this question. Let's Discuss on Board
14
As per DGMS Circular 6/2013, mining companies should engage CMPDIL or any educational institution for keeping active surveillance for longer period of time for which of the below mentioned technology?
Discuss
Answer & Solution
Answer: Option B
No explanation is given for this question. Let's Discuss on Board
15
In order to support freshly exposed roof and sides in coal mines full column grouted roof bolts preferably be used as support as per which DGMS circular?
Discuss
Answer & Solution
Answer: Option A
No explanation is given for this question. Let's Discuss on Board
16
As per DGMS stipulation on freshly exposed roof which of the following statement is true in the context of minimum damage due to blasting?
Discuss
Answer & Solution
Answer: Option A
No explanation is given for this question. Let's Discuss on Board
17
As per extant regulation under CMR 1957 and MMR 1961 what is to be confirmed by the Shotfirer before a shot hole is charged, stemmed and fired?
Discuss
Answer & Solution
Answer: Option D
No explanation is given for this question. Let's Discuss on Board
18
The provision given on weak immediate roof including supporting lips of ledges adequately by artificial means i.e. by a set of 2 or 3 cross bars duly kept lagged is from which circular?
Discuss
Answer & Solution
Answer: Option D
No explanation is given for this question. Let's Discuss on Board
19
In order to have appropriate health and safety management system which of the following tool is used?
Discuss
Answer & Solution
Answer: Option D
No explanation is given for this question. Let's Discuss on Board
20
During roof bolt installation which of the following measures should be kept in mind?
Discuss
Answer & Solution
Answer: Option C
No explanation is given for this question. Let's Discuss on Board