Once the pillar extraction is commenced the splitting of pillars may be done upto pillars ahead of the pillar is under extraction.
A. 2
B. 1
C. 3
D. 4
Answer: Option A
A. 2
B. 1
C. 3
D. 4
Answer: Option A
The required water for 1 ton of sand in hydraulic sand stowing is . . . . . . . .
A. 800 l
B. 600 l
C. 1100 l
D. 1200 l