Shear cracks between the main wall and cross wall can be corrected using:
A. Grouting
B. Rebuilding
C. Guining
D. Toothing
Answer: Option D
Solution (By Examveda Team)
Shear cracks appears due to poor bonding between main and cross wall. This can be corrected using toothing.Related Questions on Building Maintenance
Creep in concrete structure increases with:
A. Increase in humidity
B. Increase in water
C. Decrease in temperature
D. Decrease in humidity
To control corrosion, concrete with _________ is used.
A. Low permeability
B. Low thermal coefficient
C. More cement content
D. More coarse aggregates
Join The Discussion