The approach used in top-down analysis and and design is
A. to prepare flowcharts after programming has been completed
B. to identify a top level function and then create a hierarchy of lower level modules and components
C. to identify the top level functions by combining many smaller components into a single entity.
D. All of the above
E. None of the above
Answer: Option B
A. study of an existing system
B. documenting the existing system.
C. identifying current deficiencies and establishing new goals
D. All of the above
E. None of the above
The primary tool used in structured design is a:
A. structure chart
B. data-flow diagram
C. program flowchart
D. module
E. None of the above
In a _____ one module of the new information system is activates at a time.
A. System Development Life Cycle
B. CASE tool
C. Phased Conversion
D. Success factors
E. None of the above.
A. BASIC is used
B. COBOL is used
C. 4GLs are used
D. system is documented
E. None of the above
Join The Discussion