The code of practice shall be provided for
A. Safe operating procedure for the machinery
B. Examination and testing of the machinery before first use after errection, installation, modification, alteration etc
C. Schedule and nature of examination and testing includes its safe operation
D. Manner in which records of examination are kept
E. All
Answer: Option E