Examveda

The Crossrail project in London dealt with tunnel excavation through:

A. Active fault zones

B. Chalk and clay formations

C. Granite batholith

D. Peat deposits

Answer: Option B

Solution (By Examveda Team)

The tunnels were constructed through London clay and chalk formations, requiring careful design to prevent settlement above.

Join The Discussion

Related Questions on Case Studies and Applied Geological Engineering Projects