The data base be prepared until
A. the computer has been selected
B. the MIS staff has been acquired and organized
C. the preparation of physical facilities
D. All of the above
E. None of the above
Answer: Option A
A. study of an existing system
B. documenting the existing system.
C. identifying current deficiencies and establishing new goals
D. All of the above
E. None of the above
The primary tool used in structured design is a:
A. structure chart
B. data-flow diagram
C. program flowchart
D. module
E. None of the above
In a _____ one module of the new information system is activates at a time.
A. System Development Life Cycle
B. CASE tool
C. Phased Conversion
D. Success factors
E. None of the above.
A. BASIC is used
B. COBOL is used
C. 4GLs are used
D. system is documented
E. None of the above
Join The Discussion