The design, construction and layout of haul roads in opencast mines must satisfy which one of the following
A. 1 in 3
B. 1 in 6
C. 1 in 10
D. standards as laid down by a special order by CI
Answer: Option D
A. 1 in 3
B. 1 in 6
C. 1 in 10
D. standards as laid down by a special order by CI
Answer: Option D
A. Normal distribution
B. Skewed distribution
C. Lognormal distribution
D. Poisson distribution
A. 3 level heading district
B. 4 level heading district
C. 5 level heading district
D. 6 level heading district
It is very difficult to control shaley roof if coal is not left with the shale why?
A. It is weak in nature
B. It has weathering effect
C. It has great affinity to absorb moisture and get departed from immediate roof
D. It reacts with coaly surface