The East-West Metro Tunnel under the Hooghly river was executed using:

A. Cut-and-cover method

B. Tunnel boring machines (TBM)

C. Drilled shaft tunneling

D. Immersed tube method

Answer: Option B

Solution (By Examveda Team)

The East-West Metro in Kolkata used a tunnel boring machine (TBM) to excavate the river crossing beneath the Hooghly. This method minimized surface disturbance and managed soft ground.