The feasibility study of an opencast mine revealed the following:
Recoverable value per tonne of ore = Rs. 900
Production cost per tonne of ore = Rs. 550
Stripping cost per tonne of waste = Rs. 45
The break even stripping ratio will be
A. 7.77
B. 32.20
C. 1.78
D. 12.22
Answer: Option A