The feasibility study of an opencast mine revealed the following:
Recoverable value per tonne of ore = Rs. 900
Production cost per tonne of ore = Rs. 550
Stripping cost per tonne of waste = Rs. 45
The break even stripping ratio will be

Answer & Solution
Correct Answer: Option A
Let's discuss the solution. Join the discussion