Examveda

The isolation stoppings should be well locked into the roof, floor, sides the minimum depth of locking should be shale.

A. 30 cm

B. 50 cm

C. 15 cm

D. 1 m

Answer: Option A


This Question Belongs to Mining Engineering >> Drilling And Blasting

Join The Discussion

Related Questions on Drilling and Blasting