The kor depth for rice is 190 mm and kor period is 14 days. The outlet factor for this will be
A. 637 hectares/m3/sec
B. 837 hectares/m3/sec
C. 972 hectares/m3/sec
D. 1172 hectares/m3/sec
Answer: Option A
Join The Discussion
Comments ( 3 )
Related Questions on Irrigation Engineering
Finally formed berms in canals are provided for
A. Protection of banks erosion by the waves
B. Control of seepage losses
C. Strengthening of banks
D. All the above
Canals constructed for draining off water from water logged areas, are known
A. Drains
B. Inundation canals
C. Valley canals
D. Contour canals
A hydroelectric scheme operating under a head of 80 m will be classified as
A. low head scheme
B. medium head scheme
C. high head scheme
D. none of the above
A. Low sodium water
B. Medium sodium water
C. High sodium water
D. Very high sodium water
The outlet factor is duty of outlet.So here base period and delta are given as 14 and 190 mm.The formula is duty=8.64B/Delta.Delta will be in metre.8.64*1000*14/190=636.7 hectares/cumec
the outlet factor is nothing but Duty
8.64*14/190=6.366m
Outlet Factor(D) = 8.64*b/ Δ