Examveda

The main geological issue during the construction of the Delhi Metro was:

A. Seismic faulting

B. Loose sandy soil with high water table

C. Igneous dykes

D. Glacial moraine

Answer: Option B

Solution (By Examveda Team)

The Delhi Metro construction faced difficulties due to loose sandy soil combined with a high water table, requiring dewatering and soil stabilization techniques.