The main geological issue during the construction of the Delhi Metro was:
A. Seismic faulting
B. Loose sandy soil with high water table
C. Igneous dykes
D. Glacial moraine
Answer: Option B
Solution (By Examveda Team)
The Delhi Metro construction faced difficulties due to loose sandy soil combined with a high water table, requiring dewatering and soil stabilization techniques.Which geotechnical failure occurred in the 1963 Vajont Dam disaster in Italy?
A. Overtopping of dam
B. Foundation failure
C. Landslide into reservoir
D. Earthquake-induced cracking
What was the main geological issue in the Panama Canal expansion project?
A. Lava flow
B. Marine sediment instability
C. Hard rock tunneling
D. Seismic liquefaction
In the case of the Leaning Tower of Pisa, what caused the leaning?
A. Uneven settlement due to clayey soil
B. Earthquake damage
C. Poor construction material
D. Tectonic movement
Which engineering technique stabilized the Hong Kong slopes after landslide disasters?
A. Tunneling
B. Shotcreting and soil nailing
C. Earth reinforcement
D. Floating raft foundation