The method of drilling not belongs to Rotory drilling
A. Churn drilling
B. Diamond drilling
C. Chilled shots drilling
D. Rock roller bit drilling
Answer: Option A
A. Churn drilling
B. Diamond drilling
C. Chilled shots drilling
D. Rock roller bit drilling
Answer: Option A
The required water for 1 ton of sand in hydraulic sand stowing is . . . . . . . .
A. 800 l
B. 600 l
C. 1100 l
D. 1200 l