The normal curing period for lime mortar, is:
A. 1 day
B. 3 days
C. 7 days
D. 10 days
Answer: Option C
A. 1 day
B. 3 days
C. 7 days
D. 10 days
Answer: Option C
For the manufacture of plywood, veneers are placed so that grains of adjacent veneers
A. Run at right angles
B. Parallel
C. Inclined at 45°
D. Inclined at 60°
Stucco paints are suitable for
A. Stone masonry
B. Brick walls
C. Both (A) and (B)
D. Neither (A) nor (B)