The person communicating with the manager to identify information needs is the
A. executive vice-president
B. vice- president of information system
C. programmer
D. system analyst
E. None of the above
Answer: Option D
Join The Discussion
Comments ( 2 )
Related Questions on System Analysis and Design
A. study of an existing system
B. documenting the existing system.
C. identifying current deficiencies and establishing new goals
D. All of the above
E. None of the above
The primary tool used in structured design is a:
A. structure chart
B. data-flow diagram
C. program flowchart
D. module
E. None of the above
In a _____ one module of the new information system is activates at a time.
A. System Development Life Cycle
B. CASE tool
C. Phased Conversion
D. Success factors
E. None of the above.
A. BASIC is used
B. COBOL is used
C. 4GLs are used
D. system is documented
E. None of the above
Who writes technical requirements from business requirements gathered from the Business Analyst
Which of the following is not a factor in the failure of the system development project