The primary reason for tunnel lining design changes in Bengaluru Metro was:

Answer & Solution
Correct Answer: Option A
During construction of the Bengaluru Metro, unexpected groundwater ingress prompted the use of waterproofing membranes and reinforced concrete linings to prevent seepage and ensure tunnel longevity.