The purpose of boring is
A. Drain off gas from old workings
B. Sending the incombustable material to seal off fire areas
C. Known the throw of faults
D. All these
Answer: Option D
A. Drain off gas from old workings
B. Sending the incombustable material to seal off fire areas
C. Known the throw of faults
D. All these
Answer: Option D
The required water for 1 ton of sand in hydraulic sand stowing is . . . . . . . .
A. 800 l
B. 600 l
C. 1100 l
D. 1200 l