The purpose of lining of bore hole
A. Prevent water percolation
B. Easy drilling operation
C. Prevent caving in of sides
D. None
Answer: Option C
A. Prevent water percolation
B. Easy drilling operation
C. Prevent caving in of sides
D. None
Answer: Option C
The required water for 1 ton of sand in hydraulic sand stowing is . . . . . . . .
A. 800 l
B. 600 l
C. 1100 l
D. 1200 l