Examveda

The quantity per min should be of the working face.

A. 6 m3 per m2

B. 5 m3 per m2

C. 7 m3 per m2

D. 8 m3 per m2

Answer: Option C


This Question Belongs to Mining Engineering >> Drilling And Blasting

Join The Discussion

Related Questions on Drilling and Blasting