"Travel Charts" are used to
A. Analyze material handling
B. Determine inventory control difficulties
C. Plan material handling procedure and routes
D. All of the above
Answer: Option D
Solution(By Examveda Team)
The chart which gives an estimate about the amount of materials handling between various work stations is known as "Travel Chart".The aim in the construction of Travel Chart is to decide such a layout where overall materials handling function is performed at a minimum cost.
Related Questions on Industrial Engineering and Production Management
The essential condition for the decompression of an activity is that
A. The project time should change due to decompression
B. After decompression the time of an activity invariably exceeds its normal time
C. An activity could be decompressed to the maximum extent of its normal time
D. None of the above
A. CAM < DAM
B. CAM > DAM
C. CAM = DAM
D. There is no such criterion