What is the meaning of SWL in material handling
A. Solid waste load
B. Safe working load
C. Structure wire loading
D. Satutory work land
Answer: Option B
A. Solid waste load
B. Safe working load
C. Structure wire loading
D. Satutory work land
Answer: Option B
The required water for 1 ton of sand in hydraulic sand stowing is . . . . . . . .
A. 800 l
B. 600 l
C. 1100 l
D. 1200 l
Join The Discussion