What mitigation method was implemented at the Vajont Dam post-failure?

A. Lowering reservoir level

B. Installing drainage tunnels

C. Complete demolition

D. Relocation of dam site

Answer: Option A

Solution (By Examveda Team)

After the deadly landslide in 1963, authorities lowered the reservoir level permanently to reduce hydrostatic pressure and risk of future slope failure.