What requirement gathering method developed at IBM in 1970s is used for managing requirement elicitation ?
A. JAD
B. Traceability
C. FAST
D. Both JAD and Traceability
Answer: Option D
A. JAD
B. Traceability
C. FAST
D. Both JAD and Traceability
Answer: Option D
Which of the following is not a phase of the Software Development Life Cycle (SDLC)?
A. Planning
B. Analysis
C. Testing
D. Maintenance
What does UML stand for in software engineering?
A. Unified Modeling Language
B. Universal Modeling Language
C. Unique Modeling Language
D. Unified Management Language
Which software development model is also known as the linear-sequential life cycle model?
A. Agile
B. Waterfall
C. Spiral
D. RAD (Rapid Application Development)
In which phase of the SDLC is the feasibility study conducted?
A. Planning
B. Design
C. Implementation
D. Maintenance