Examveda

What was the major geological issue in the Chunnel (Channel Tunnel) project?

A. Water ingress in chalk marl

B. Rockburst

C. Thermal cracking

D. Fault slip zones

Answer: Option A

Solution (By Examveda Team)

The Channel Tunnel passed through chalk marl, which presented groundwater control issues. Pressurized TBMs and sealing techniques were used to handle water ingress.

Join The Discussion

Related Questions on Case Studies and Applied Geological Engineering Projects