When was Bandra-Worli Sea Link opened to the public?

Answer & Solution
Correct Answer: Option D
The first four of the eight lanes of the bridge were opened to the public on 30th June 2009. All eight lanes were opened on 24th March 2010. The sea link reduces travel time between Bandra and Worli during peak hours from 20 to 30 minutes to 10 minutes.