Which bridge had to consider foundation on weathered schist and required deep piling?
A. Vidyasagar Setu
B. Godavari Arch Bridge
C. Bogibeel Bridge
D. Chenab Bridge
Answer: Option A
Solution (By Examveda Team)
Vidyasagar Setu in Kolkata was built over soft soils and weathered schist layers. Deep piling ensured stability of the cable-stayed bridge despite challenging subsurface conditions.Which geotechnical failure occurred in the 1963 Vajont Dam disaster in Italy?
A. Overtopping of dam
B. Foundation failure
C. Landslide into reservoir
D. Earthquake-induced cracking
What was the main geological issue in the Panama Canal expansion project?
A. Lava flow
B. Marine sediment instability
C. Hard rock tunneling
D. Seismic liquefaction
In the case of the Leaning Tower of Pisa, what caused the leaning?
A. Uneven settlement due to clayey soil
B. Earthquake damage
C. Poor construction material
D. Tectonic movement
Which engineering technique stabilized the Hong Kong slopes after landslide disasters?
A. Tunneling
B. Shotcreting and soil nailing
C. Earth reinforcement
D. Floating raft foundation