Examveda

Which construction project faced tunneling challenges due to swelling clay (montmorillonite)?

A. Channel Tunnel

B. Panama Canal

C. Heathrow Terminal 5

D. Brenner Base Tunnel

Answer: Option A

Solution (By Examveda Team)

The Channel Tunnel encountered swelling clays like montmorillonite, which absorbed water and expanded, causing stress on tunnel linings.