Which dam faced challenges due to sediment inflow from rapidly eroding catchment?
A. Bhakra Dam
B. Tehri Dam
C. Aswan High Dam
D. Mangla Dam
Answer: Option C
Solution (By Examveda Team)
The Aswan High Dam on the Nile River experienced significant sediment accumulation in its reservoir (Lake Nasser), reducing storage capacity and posing long-term operational challenges.Which geotechnical failure occurred in the 1963 Vajont Dam disaster in Italy?
A. Overtopping of dam
B. Foundation failure
C. Landslide into reservoir
D. Earthquake-induced cracking
What was the main geological issue in the Panama Canal expansion project?
A. Lava flow
B. Marine sediment instability
C. Hard rock tunneling
D. Seismic liquefaction
In the case of the Leaning Tower of Pisa, what caused the leaning?
A. Uneven settlement due to clayey soil
B. Earthquake damage
C. Poor construction material
D. Tectonic movement
Which engineering technique stabilized the Hong Kong slopes after landslide disasters?
A. Tunneling
B. Shotcreting and soil nailing
C. Earth reinforcement
D. Floating raft foundation