Examveda

Which dam faced challenges due to sediment inflow from rapidly eroding catchment?

A. Bhakra Dam

B. Tehri Dam

C. Aswan High Dam

D. Mangla Dam

Answer: Option C

Solution (By Examveda Team)

The Aswan High Dam on the Nile River experienced significant sediment accumulation in its reservoir (Lake Nasser), reducing storage capacity and posing long-term operational challenges.

Join The Discussion

Related Questions on Case Studies and Applied Geological Engineering Projects