Which factor is NOT a part of geological mapping for construction?
A. Lithology
B. Structural geology
C. Climate patterns
D. Geomorphology
Answer: Option C
Solution (By Examveda Team)
Climate patterns affect construction scheduling but are not part of geological mapping, which focuses on rock type, structure, and landforms.Related Questions on Engineering Geology for Construction
What is the most important geological consideration before constructing a dam?
A. Soil fertility
B. Rock type and structure
C. Surface vegetation
D. Proximity to roads
Which test is commonly used to determine rock strength for construction suitability?
A. Permeability test
B. Schmidt hammer test
C. Sieve analysis
D. Vane shear test
What geological structure is most hazardous for tunnel construction?
A. Horizontal bedding
B. Fault zone
C. Anticline fold
D. Massive granite
The unconfined compressive strength of a rock is a measure of its:
A. Tensile strength
B. Load-bearing capacity without lateral support
C. Weathering rate
D. Porosity

Join The Discussion