Which major tunnel collapse was attributed to poor geological mapping and unsupported face?
A. Fort Point Channel collapse
B. Daikai Station collapse
C. Nicoll Highway collapse
D. Lake Peigneur disaster
Answer: Option C
Solution (By Examveda Team)
The Nicoll Highway collapse (Singapore, 2004) occurred due to failure of retaining walls in soft marine clay, compounded by poor understanding of site geology and inadequate support.Which geotechnical failure occurred in the 1963 Vajont Dam disaster in Italy?
A. Overtopping of dam
B. Foundation failure
C. Landslide into reservoir
D. Earthquake-induced cracking
What was the main geological issue in the Panama Canal expansion project?
A. Lava flow
B. Marine sediment instability
C. Hard rock tunneling
D. Seismic liquefaction
In the case of the Leaning Tower of Pisa, what caused the leaning?
A. Uneven settlement due to clayey soil
B. Earthquake damage
C. Poor construction material
D. Tectonic movement
Which engineering technique stabilized the Hong Kong slopes after landslide disasters?
A. Tunneling
B. Shotcreting and soil nailing
C. Earth reinforcement
D. Floating raft foundation
Join The Discussion