Which of the following is needed by Maintenance staff?
A. A specific type of equipment
B. Maintenance record for each and every equipment item
C. Check in/check out equipment for maintenance
D. All of the mentioned
Answer: Option D
A. A specific type of equipment
B. Maintenance record for each and every equipment item
C. Check in/check out equipment for maintenance
D. All of the mentioned
Answer: Option D
Which of the following is not a phase of the Software Development Life Cycle (SDLC)?
A. Planning
B. Analysis
C. Testing
D. Maintenance
What does UML stand for in software engineering?
A. Unified Modeling Language
B. Universal Modeling Language
C. Unique Modeling Language
D. Unified Management Language
Which software development model is also known as the linear-sequential life cycle model?
A. Agile
B. Waterfall
C. Spiral
D. RAD (Rapid Application Development)
In which phase of the SDLC is the feasibility study conducted?
A. Planning
B. Design
C. Implementation
D. Maintenance